top of page
Commercial & Communications

21 Moorfields

London EC2

Overview

This prestigious commercial development is directly above Moorgate Underground Station in the heart of the City of London. It will be the headquarters of Deutsche Bank, covering 564,000 sq ft of commercial office space with a reconfigured public square with retail stores and improved landscaping.


It is one of Pipe Solutions' flagship projects. It took on some unique and complex pipe design challenges above and below ground to ensure the pipework could accommodate the expansion and building movement.


Mechanical Contractor: Gratte Brothers

Services Consultant: Robert Bird Group

Products supplied:

  • Caesar II Pipe Stress Analysis.

  • Variable Spring Hangers

  • Expansion Joints

  • IN 4809 Chiller Connectors

  • Pipe Slide Guides

  • St/St Hose Loops

  • Pipe Anchor Brackets

  • Building Movement Joints

Project Gallery

bottom of page