Project - 21 Moorfields, London EC2



Overview


This prestigious commercial development is directly above Moorgate Underground Station in the heart of the City of London. It will be the headquarters of Deutsche Bank, covering 564,000 sq ft of commercial office space with a reconfigured public square with retail stores and improved landscaping.

It is one of Pipe Solutions' flagship projects. It took on some unique and complex pipe design challenges above and below ground to ensure the pipework could accommodate the expansion and building movement.


Mechanical Contractor: Gratte Brothers

Services Consultant: Robert Bird Group


Products supplied: Caesar II Pipe Stress Analysis.

Variable Spring Hangers

Expansion Joints

- IN 4809 Chiller Connectors

Pipe Slide Guides

St/St Hose Loops

Pipe Anchor Brackets

Building Movement Joints